Idaho Power Co
WaDE Blank115662
Flow
130 CFS
Volume
0 AF
Priority Date
August 13, 1981
Allocation Details
Allocation TypePrior Appropriation
Legal StatusWaDE Blank
Water Source TypeSurface Ground Storage
Allocation BasisWaDE Blank
Beneficial UsesFish Culture
Irrigated Acreage—
Priority DateAugust 13, 1981
Application Date—
Expiration Date—
Owner Information
Owner NameIdaho Power Co
Owner ClassificationPrivate
OrganizationWater right surface Points of Diversion (POD) and groundwater Points of Appropriation (POA) locations in the state of Oregon are collectively referred to as PODs.
Last published: November 3, 2024
Source: OR state engineer via WaDE