Gary Gant
WaDE Blank141400
Flow
0.082 CFS
Volume
0 AF
Priority Date
January 15, 1998
Allocation Details
Allocation TypePrior Appropriation
Legal StatusWaDE Blank
Water Source TypeSurface Ground Storage
Allocation BasisWaDE Blank
Beneficial UsesCranberry
Irrigated Acreage10.3 acres
Priority DateJanuary 15, 1998
Application Date—
Expiration Date—
Owner Information
Owner NameGary Gant
Owner ClassificationPrivate
OrganizationWater right surface Points of Diversion (POD) and groundwater Points of Appropriation (POA) locations in the state of Oregon are collectively referred to as PODs.
Last published: November 3, 2024
Source: OR state engineer via WaDE