Henry Lumber Co
WaDE Blank61304
Flow
0.67 CFS
Volume
0 AF
Priority Date
August 30, 1928
Allocation Details
Allocation TypePrior Appropriation
Legal StatusWaDE Blank
Water Source TypeSurface Ground Storage
Allocation BasisWaDE Blank
Beneficial UsesDomestic, Industrial/Manufacturing Uses
Irrigated Acreage—
Priority DateAugust 30, 1928
Application Date—
Expiration Date—
Owner Information
Owner NameHenry Lumber Co
Owner ClassificationPrivate
OrganizationWater right surface Points of Diversion (POD) and groundwater Points of Appropriation (POA) locations in the state of Oregon are collectively referred to as PODs.
Last published: November 3, 2024
Source: OR state engineer via WaDE