David Turin Mt Hood Rock Products

WaDE Blank

170539

Flow
0.009 CFS
Volume
0 AF
Priority Date
August 8, 1997

Allocation Details

Allocation TypePrior Appropriation
Legal StatusWaDE Blank
Water Source TypeSurface Ground Storage
Allocation BasisWaDE Blank
Beneficial UsesIndustrial/Manufacturing Uses, Mining
Irrigated Acreage—
Priority DateAugust 8, 1997
Application Date—
Expiration Date—

Owner Information

Owner NameDavid Turin Mt Hood Rock Products
Owner ClassificationPrivate
OrganizationWater right surface Points of Diversion (POD) and groundwater Points of Appropriation (POA) locations in the state of Oregon are collectively referred to as PODs.

Last published: November 3, 2024

Source: OR state engineer via WaDE

← OR Water Rights