Pearl Ulam

WaDE Blank

76729

Flow
0.33 CFS
Volume
0 AF
Priority Date
April 15, 1953

Allocation Details

Allocation TypePrior Appropriation
Legal StatusWaDE Blank
Water Source TypeSurface Ground Storage
Allocation BasisWaDE Blank
Beneficial UsesIrrigation
Irrigated Acreage26.5 acres
Priority DateApril 15, 1953
Application Date—
Expiration Date—

Owner Information

Owner NamePearl Ulam
Owner ClassificationPrivate
OrganizationWater right surface Points of Diversion (POD) and groundwater Points of Appropriation (POA) locations in the state of Oregon are collectively referred to as PODs.

Last published: November 3, 2024

Source: OR state engineer via WaDE

← OR Water Rights