Carlon Cattle Co
WaDE Blank104465
Flow
1.92 CFS
Volume
0 AF
Priority Date
April 12, 1976
Allocation Details
Allocation TypePrior Appropriation
Legal StatusWaDE Blank
Water Source TypeSurface Ground Storage
Allocation BasisWaDE Blank
Beneficial UsesIrrigation
Irrigated Acreage153.8 acres
Priority DateApril 12, 1976
Application Date—
Expiration Date—
Owner Information
Owner NameCarlon Cattle Co
Owner ClassificationPrivate
OrganizationWater right surface Points of Diversion (POD) and groundwater Points of Appropriation (POA) locations in the state of Oregon are collectively referred to as PODs.
Last published: November 3, 2024
Source: OR state engineer via WaDE