Pine Ridge Winery Dba Archery Summit Winery
WaDE Blank223330
Flow
0.029 CFS
Volume
0 AF
Priority Date
August 10, 2007
Allocation Details
Allocation TypePrior Appropriation
Legal StatusWaDE Blank
Water Source TypeSurface Ground Storage
Allocation BasisWaDE Blank
Beneficial UsesIrrigation
Irrigated Acreage2.3 acres
Priority DateAugust 10, 2007
Application Date—
Expiration Date—
Owner Information
Owner NamePine Ridge Winery Dba Archery Summit Winery
Owner ClassificationPrivate
OrganizationWater right surface Points of Diversion (POD) and groundwater Points of Appropriation (POA) locations in the state of Oregon are collectively referred to as PODs.
Last published: November 3, 2024
Source: OR state engineer via WaDE