Chas E Cone
WaDE Blank61102
Flow
0.5 CFS
Volume
0 AF
Priority Date
October 12, 1926
Allocation Details
Allocation TypePrior Appropriation
Legal StatusWaDE Blank
Water Source TypeSurface Ground Storage
Allocation BasisWaDE Blank
Beneficial UsesFish Culture
Irrigated Acreage—
Priority DateOctober 12, 1926
Application Date—
Expiration Date—
Owner Information
Owner NameChas E Cone
Owner ClassificationPrivate
OrganizationWater right surface Points of Diversion (POD) and groundwater Points of Appropriation (POA) locations in the state of Oregon are collectively referred to as PODs.
Last published: November 3, 2024
Source: OR state engineer via WaDE