Brandi Waits

WaDE Blank

221168

Flow
0.051 CFS
Volume
0 AF
Priority Date
December 31, 1854

Allocation Details

Allocation TypePrior Appropriation
Legal StatusWaDE Blank
Water Source TypeSurface Ground Storage
Allocation BasisWaDE Blank
Beneficial UsesIrrigation
Irrigated Acreage4.2 acres
Priority DateDecember 31, 1854
Application Date—
Expiration Date—

Owner Information

Owner NameBrandi Waits
Owner ClassificationPrivate
OrganizationWater right surface Points of Diversion (POD) and groundwater Points of Appropriation (POA) locations in the state of Oregon are collectively referred to as PODs.

Last published: November 3, 2024

Source: OR state engineer via WaDE

← OR Water Rights