Nadine Jackson

WaDE Blank

222283

Flow
0 CFS
Volume
26.76 AF
Priority Date
February 7, 2022

Allocation Details

Allocation TypePrior Appropriation
Legal StatusWaDE Blank
Water Source TypeSurface Ground Storage
Allocation BasisWaDE Blank
Beneficial UsesIrrigation
Irrigated Acreage12 acres
Priority DateFebruary 7, 2022
Application Date—
Expiration Date—

Owner Information

Owner NameNadine Jackson
Owner ClassificationPrivate
OrganizationWater right surface Points of Diversion (POD) and groundwater Points of Appropriation (POA) locations in the state of Oregon are collectively referred to as PODs.

Last published: November 3, 2024

Source: OR state engineer via WaDE

← OR Water Rights