Hood River Cherry Co

WaDE Blank

222292

Flow
0.99 CFS
Volume
0 AF
Priority Date
April 18, 2016

Allocation Details

Allocation TypePrior Appropriation
Legal StatusWaDE Blank
Water Source TypeSurface Ground Storage
Allocation BasisWaDE Blank
Beneficial UsesIrrigation
Irrigated Acreage105 acres
Priority DateApril 18, 2016
Application Date—
Expiration Date—

Owner Information

Owner NameHood River Cherry Co
Owner ClassificationPrivate
OrganizationWater right surface Points of Diversion (POD) and groundwater Points of Appropriation (POA) locations in the state of Oregon are collectively referred to as PODs.

Last published: November 3, 2024

Source: OR state engineer via WaDE

← OR Water Rights