Boise Cascade Corp

WaDE Blank

111278

Flow
0 CFS
Volume
130.8 AF
Priority Date
August 18, 1976

Allocation Details

Allocation TypePrior Appropriation
Legal StatusWaDE Blank
Water Source TypeSurface Ground Storage
Allocation BasisWaDE Blank
Beneficial UsesIndustrial/Manufacturing Uses, Log Deck Sprinkling
Irrigated Acreage—
Priority DateAugust 18, 1976
Application Date—
Expiration Date—

Owner Information

Owner NameBoise Cascade Corp
Owner ClassificationPrivate
OrganizationWater right surface Points of Diversion (POD) and groundwater Points of Appropriation (POA) locations in the state of Oregon are collectively referred to as PODs.

Last published: November 3, 2024

Source: OR state engineer via WaDE

← OR Water Rights