Carl E Suttner

WaDE Blank

91855

Flow
0.05 CFS
Volume
0 AF
Priority Date
April 18, 1968

Allocation Details

Allocation TypePrior Appropriation
Legal StatusWaDE Blank
Water Source TypeSurface Ground Storage
Allocation BasisWaDE Blank
Beneficial UsesFish Culture
Irrigated Acreage—
Priority DateApril 18, 1968
Application Date—
Expiration Date—

Owner Information

Owner NameCarl E Suttner
Owner ClassificationPrivate
OrganizationWater right surface Points of Diversion (POD) and groundwater Points of Appropriation (POA) locations in the state of Oregon are collectively referred to as PODs.

Last published: November 3, 2024

Source: OR state engineer via WaDE

← OR Water Rights