Odin Hollin
WaDE Blank88810
Flow
0.62 CFS
Volume
0 AF
Priority Date
August 17, 1967
Allocation Details
Allocation TypePrior Appropriation
Legal StatusWaDE Blank
Water Source TypeSurface Ground Storage
Allocation BasisWaDE Blank
Beneficial UsesIrrigation
Irrigated Acreage49.6 acres
Priority DateAugust 17, 1967
Application Date—
Expiration Date—
Owner Information
Owner NameOdin Hollin
Owner ClassificationPrivate
OrganizationWater right surface Points of Diversion (POD) and groundwater Points of Appropriation (POA) locations in the state of Oregon are collectively referred to as PODs.
Last published: November 3, 2024
Source: OR state engineer via WaDE