Tice Shull
WaDE Blank54480
Flow
2 CFS
Volume
0 AF
Priority Date
March 10, 1913
Allocation Details
Allocation TypePrior Appropriation
Legal StatusWaDE Blank
Water Source TypeSurface Ground Storage
Allocation BasisWaDE Blank
Beneficial UsesSupplemental Irrigation
Irrigated Acreage160 acres
Priority DateMarch 10, 1913
Application Date—
Expiration Date—
Owner Information
Owner NameTice Shull
Owner ClassificationPrivate
OrganizationWater right surface Points of Diversion (POD) and groundwater Points of Appropriation (POA) locations in the state of Oregon are collectively referred to as PODs.
Last published: November 3, 2024
Source: OR state engineer via WaDE