James Rutten
WaDE Blank97973
Flow
0.1 CFS
Volume
0 AF
Priority Date
June 16, 1965
Allocation Details
Allocation TypePrior Appropriation
Legal StatusWaDE Blank
Water Source TypeSurface Ground Storage
Allocation BasisWaDE Blank
Beneficial UsesIrrigation
Irrigated Acreage7.9 acres
Priority DateJune 16, 1965
Application Date—
Expiration Date—
Owner Information
Owner NameJames Rutten
Owner ClassificationPrivate
OrganizationWater right surface Points of Diversion (POD) and groundwater Points of Appropriation (POA) locations in the state of Oregon are collectively referred to as PODs.
Last published: November 3, 2024
Source: OR state engineer via WaDE