Muddy Creeks Irrigation Project

WaDE Blank

179967

Flow
0.756 CFS
Volume
0 AF
Priority Date
February 9, 1939

Allocation Details

Allocation TypePrior Appropriation
Legal StatusWaDE Blank
Water Source TypeSurface Ground Storage
Allocation BasisWaDE Blank
Beneficial UsesIrrigation
Irrigated Acreage181.5 acres
Priority DateFebruary 9, 1939
Application Date—
Expiration Date—

Owner Information

Owner NameMuddy Creeks Irrigation Project
Owner ClassificationPrivate
OrganizationWater right surface Points of Diversion (POD) and groundwater Points of Appropriation (POA) locations in the state of Oregon are collectively referred to as PODs.

Last published: November 3, 2024

Source: OR state engineer via WaDE

← OR Water Rights